Drill pilot holes and hand nail the boards until there is no longer clearance for the drill and hammer.
How to hand nail hardwood floor.
Option 2 face nail using electric brand nail gun or finish nail gun the first few rows of boards you install.
Nail it to the baseboard not to the floor or subfloor.
At that point drill pilot holes down into the top of the boards and face nail the boards remembering to set the nails with a nail set.
By nailing a board through the tongue and tapping the groove of the next board over the nail the installer is able to securely attach the boards to the sub floor without the nails being visible.
For correct use make sure the tool s nail shoe is well positioned on the tongue angled at about 15 degrees inward and downward as if moving to the plank.
Before flooring installers had power nailers they had to blind nail all flooring boards by hand.
Engineered flooring can be installed above grade at grade and below grade level do not install hardwood flooring in bathrooms.
Always check with the manufacturer s instructions to determine if your hardwood floor can be installed over an in floor radiant heat system.
This will keep your very first rows straight where wall prevents the use of the floor nail gun.
The process of blind nailing.
Hardwood flooring nails may be invisible but you can drive them by hand.
Keep the lower edge of the baseboard even with the top of the floor and nail the baseboard into the wall.
Use a pry bar and a few extra scraps of flooring to firmly seat the hardwood plank as you nail.
Nail threshold or transition strips in place where the edge of the floor is exposed.
The process involves driving a series of nails into the tongue of a.
Option 1 face nail using finish nails then angle nail the first few rows of boards you install.