Installing a pre hung door is easier and faster than starting from scratch since most of the more labor intensive work is already done.
How to install 1934 floor on frame.
So we cut it out and it was repaired.
Osb floor sheeting is typically 3 4 thick and comes with a tounge and goove to give the spans between the floor joists strength.
In this video matt shows how he fabricated floor pans for his model a using some sheet metal and a handful of eastwood tools while offering a couple helpfu.
To install standard metal bridging brace the pointed ends of the bars against the joists then nail down the open ends.
It feels like i have been talking about this step for weeks on end but its finally.
Then use a nail gun to secure the 2 pieces together before attaching the other side of the jamb in the same way.
To install a door jamb start by measuring the door frame and cutting the wood to size.
There were a few areas on the frame that had been poorly repaired and this area was obviously cut out at onetime in its past lives for installation of duel exhaust.
With the frame rails split apart it allowed us access to the backside of the frame rail and repair the frame properly.
Pick a wall to start installing the floor sheeting from typically you will start at the same end that you laid out the floor joists from so you can start with a full or half sheet.
Today we are finally going to be welding the body and sub rails together.
Install bridging on either end of the joists at a distance of of their total span.