Wood such as cedar and others will cost about 3 per sq ft and can cost anywhere from 7 000 to 10 000 for a 1 500 sq ft home depending on labor costs.
How to install vinyl board and batten siding.
With a helper expect to spend a day installing 800 square feet of siding.
This will make it more difficult to remove panels for repair or replacement later on as the pieces will be adhered to one another with rubber sealants.
For vinyl material you will typically see a board and batten siding cost of anywhere between 2 and 7 dollars per square foot.
To match the siding see illustration 1b.
This action will help to level the surface and provide sufficient material for 3 4 fastener penetration.
First of all you have to get all of your supplies together.
The next panel will fit over the edge of the previous one disguising the nailing strip and lock securely into place.
While installing vertical board and batten siding has many similar steps to its horizontal cousin there are 5 key steps to keep in mind when applying this exterior cladding product to your home s exterior.
If needed install horizontal furring strips every 12 or a solid nail able sheathing prior to the siding.
In addition to the siding materials there s a slew of other things you ll need to make the installation go as smoothly as possible.
You can water proof your vinyl board and batten siding by placing a bead of sealant on all exposed ends.
Line up the panel with the edging and use screws to secure it in place on the nailing strip.
Before you begin cover the sheathing with building wrap and install trim boards and flashings.
Like many types of siding you ll start installing the board and batten panels from one side.
Installation instructions vertical board batten siding board batten installation instructions 1 of 3 upper edge of topmost nailing slot ring shanked nails and washers for attaching foam 1 2 foam sheathing always position topmost nail in topmost full nail slot with vertical applications even.
This comes out to about 10 500 for a home of 1 500 sq ft.
Establish your base line.