The first if the existing floor is not too uneven is laying the new solid wood floor over the existing boards at a 90 degree angle.
How to lay oak flooring on floorboards.
The solid oak flooring could then be simply nailed or screwed down.
Glued gluing your floor is often the most popular installation method as it is usually the most simple.
Typically old softwood floorboards will be warped and or cupped making the surface irregular and therefore not the best support for your investment.
There are basically two options you can consider.
Hardwood flooring boards either solid wood flooring or engineered wood flooring can be fitted onto existing wooden floor boards.
One method to overcome this when laying a solid oak floor would be using the above method of laying out battens.
Depending on the size of your room it should take around two to three days to lay wood flooring although it has to be said that laying a fixed solid floor is a more time consuming task than installing engineered wood.
The results however speak for themselves.
03 57 timber floorboards how to sand timber floors learn how to use professional floor sanding equipment to sand a timber floor.
Place 10mm spacers against the wall running parallel with the direction of your installation.
Then install the first row of flooring with the tongue facing away from the wall and fit in place by using the flooring nailer.
The hardwood flooring should run perpendicular to the existing floor boards to provide maximum strength and stability.
To glue a wooden floor a full coverage of flexible wood adhesive must be applied to the sub floor and the boards.
Timber floorboards how to protect your floors we ll show you an easy way to protect your floors from scuff marks damage and stains when you re having work done in or around your home.
Installing solid wooden floors onto plywood.
One such area is laying an oak floor over a concrete sub floor.
Use an overlay flooring nailer also caller a porta nailer.