Use a shovel to manually remove the top 1 3 inches 2 5 7 6 cm of sod wherever you intend to level.
How to level dirt floor.
Use a long carpenter s level to make sure the.
Mark the height you want your floor with highly visible ribbon paint or marker.
Set a designated elevation to use as a guide to level the area.
Place a length of pipe rebar or wooden stake securely into the ground.
Part of the garage we did years ago and it has worked very.
Step 1 stake off your area to level.
Use this process to smooth out any major bumps or imperfections in the dirt floor.
Check the level with a carpenter s level before placing the flooring making certain that its level to keep your floorboards level in turn.
Spread the sand evenly over the dirt floor using a rake.
It is essential that you do not remove the marker until the ground leveling is complete.
Drive wooden or plastic stakes around the area to be leveled step 2 use a string level.
Remove 1 inch of dirt from the floor of the shed with a shovel.
Just a short video on a way to use junk tracks to make a floor in a dirt floored storage building.
Adjust the slope of the ground as necessary to match the.
The bubble should be in the same location as it was when placed on the top of the stakes.
On the top side of the floor another fix it idea to lay down new hardwood over the existing floor.
Leveling compound is the classic and the easiest to fix a floor that is uneven.
In fact for some interior floors it s just a matter of pouring leveling compound out and letting it find its own level.
This will usually be your starting point and the rest of the ground will be brought to.
Attach strings to stretch between the stakes a few inches above the ground.
This area does not need to be perfectly square or rectangular unless you are planning on using sod instead of simply replanting your grass.
Attach a string level to the strings to determine the high point.
Lay the level on the ground beside the stakes.
Alternatively you can slice the turf into 1 ft 0 30 m x 2 ft 0 61 m strips using an edger or sharp spade then loosen each strip with your shovel.
You will have to make sure your joists can handle the addition of considerably more weight from the plywood subfloor and any floor coverings.
Finish by starting at the farthest point from the door and leveling the sand with a trowel.
Use a carpenter s level to ensure that the new surface is flat and level.
For garages it is a little less simple.