This job can run you 1 000 and 5 000 depending on the extent of the job.
How to level old floor joists.
A day until they re level.
Set a hydraulic jack and post under the beam and jack up the joists about 1 8 in.
On the top side of the floor another fix it idea to lay down new hardwood over the existing floor.
Leveling the floor with shims is when you attach thin wedge shaped pieces of wood on top of the low areas of the joists to make the top joists even.
A plywood subfloor will bridge any minor waves in the existing floor and leveling compound would help too.
Using a chalk line.
Nailing two 2x4s together will work to span about three joists unless the sag is under a weight bearing wall.
Generally this is caused by a bowing of the floor joists which very often are not strong enough to fully support the weight placed on them.
If the floor slants irregularly cut strips that bridge the cap at each floor joist.
Tack a beam under the sagging joists.
You will have to make sure your joists can handle the addition of considerably more weight from the plywood subfloor and any floor coverings.
If the uneven floor is due to floor joists that have warped or twisted over time or were incorrectly installed the only way to level the floor is to remove the subflooring and shim the joists.
Floors in older properties are very often out of level.
To do this simply cut several leveling strips the same size as the original strip.
If you have an uneven floor you may need to think about leveling floor joists with shims.
The solution to sagging floors or the damaged sills and joist ends that contribute to them often involves jacking.
Use screws to secure the leveling strips to the floor every 16 inches.
A taut string stretched across the floor will show the amount of deflection and improvement.