To install vinyl plank flooring on concrete you ll first need to clean the concrete with soap and water and fill in any cracks with concrete filler.
How to install lvt flooring on concrete.
Concrete is a common subfloor material and in general it s easy to prepare for a luxury vinyl flooring installation project.
Click lock vinyl plank flooring also creates a floating floor but instead of having an adhesive connect the planks like gripstrip does the planks interlock with tongue and groove joints that easily snap together for a reliable fit.
Also it is important to take time and prepare well before you start assembling.
If you don t have all the tools or you want to be 100 sure you don t waste any material invite a friend over to help you.
Vinyl plank is designed to connect through click and lock and glue down techniques.
Vinyl plank installation on concrete makes the floor warm and comfortable.
Luxury vinyl flooring lvp is similar to sheet vinyl but it s thicker more durable and easier to install.
It s a floating floor which means it isn t fastened to the subfloor it just lies there.
As much as this flooring material may seem to be a perfect flooring it would be prudent to consider vinyl plank flooring pros and cons.
Vinyl plank flooring is water resistant and if it has a wpc core it s waterproof so it won t be damaged by the off gassing.
How to install vinyl plank flooring as a beginner.
Luxury vinyl tile and plank installation methods luxury vinyl is one of the fastest and easiest floors to install.
If your concrete subfloor was just poured you ll need to allow it to properly cure for a minimum of 60 days before your luxury vinyl flooring installation begins.
Newly poured concrete off gases water vapor and typically needs from 120 to 150 days to dry out before it s ready to accept flooring according to milliken company.
See my flooring install playlist.
The steps in this guide on how to install vinyl plank flooring on concrete are quite easy to follow.
Floating floors are an easy mess free way to install new flooring without necessarily having to remove the existing flooring.
It comes in tiles and planks but this article covers planks only and uses a product called adura locksolid.
Whether you choose to have your new floor professionally installed or do it yourself here s what you can expect.
Lvt can be installed directly over concrete but the concrete must be at least six weeks old proven to be dry and free of powder and flaking.