Here s how to install click lock engineered hardwood flooring.
How to lay wooden flooring on floorboards.
Step 1 let the boards acclimate.
Put the first board up against the mason s line with the groove side facing away from the walls.
This should be done at least 48 hours before the laminate boards are placed so they have time to adjust to the temperature and humidity.
Face nail each board at the point of every joist and set the nail with a nail set.
The first if the existing floor is not too uneven is laying the new solid wood floor over the existing boards at a 90 degree angle.
Moisture can often destroy a perfect laminate floor installation so before you begin it is very.
Place unopened packages of laminate flooring in the room or rooms in which they are to be installed.
Use 1 2 inch spacers to assist in maintaining the 1 2 inch expansion gap between the first row of flooring planks and the wall.
With wooden floor boards as a subfloor engineered wood flooring can also be floated or loose laid over an underlay.
Using gaffa or fabric tape fix the edges of the underlay together ensuring that the edges do not overlap and create an uneven surface.
For larger rooms lay the underlay in the opposite direction to the floorboards leaving a small gap of approximately 12mm.
Older houses with 1 inch planks running.
If you prefer a layout that requires the boards to run parallel to the joists you need to shore up the subfloor by adding a layer of 3 8 inch plywood.
Align the edge of the board with the chalk line and drill pilot holes down through the hardwood plank and into the sub floor and joist.
Starting in one corner of the room spread in excess of 2 board widths of adhesive along the starting wall sub floor using a 3mm toothed trowel.
What that means is that if your existing floor is lying lengthways in your room you should lay your new wood floor widthways in your room.
Pick one that is straight.
Begin by selecting a long board to start the first row.
When secret nailing or secret screwing any hardwood flooring down please ensure that there are no service pipes gas electricity or water underneath.
There are basically two options you can consider.